COMPLETED PROJECTS

Over the small period of last three years, the company has successfully completed following tasks:

  1. Provision of drilling and blasting services for Main Contractor M/s SOLMATE at (DHA SECTOR -PISLAMABAD).
  2. Provision of drilling, blasting and removal of blasted material up to distance of 4 km for Al Huzaifa Construction Company at KAROT HYDRO POWER PROJECT: – As Joint Venture, (spillway, penstock area and Excavation of permanent (No.5 ,3 & 1) 15KM – Roads of project).
  3. Drilling and blasting services for production of aggregate at KAROT HYDRO POWER PROJECT: -As Joint Venture with Al-Huzaifa Construction.
  4. Provision of drilling, blasting and removal of blasted material for water channel, shaft at DRAARL Hydro Power Project Bahrain Swat as Joint Venture with Geopak
  5. Provision of drilling services for FWO, 757CT at Project K4 Water Canal for Supply to Karachi as JV with M/S AAC Construction for Drilling and Blasting
  6. Rock excavation including drilling, blasting and removal at number of projects in association with AL-NAWASSY ROCK ESTABLISHMENT, ABHA SAUDI ARABIA.
  7. Oil & Gas Sector excavation and preparation of # 10009001 || Drilling and Blasting at Rayyan-1 Well with POGC at Dadu district Sindh.
  8. Demolished of 150ft high water tower at Sui cadet college sui district Baluchistan under the Pak Army unit.
  9. Provision of Drilling for FWO, 104 Engineers Battalion at KKH to Skardu Road Widening Project
(from OCTOBER 2018 -2022).
  1. Blasting Consultancy & Provision of Drilling Services for FWO, 105 Engineers Battalion KKH To Skardu Road Widening Project (from December 2018-2021).
  2. Provision of Services for China Gazoba Wah Nobel  J/V   Working on Extension of Jamshoro Power Plant as Drilling & Blasting and removal of material Contractor (from june-2019-2020).
  3. Drilling activities at DG khan cement hub Baluchistan from 2021 -2022.