COMPLETED PROJECTS
Over the small period of last three years, the company has successfully completed following tasks:
- Provision of drilling and blasting services for Main Contractor M/s SOLMATE at (DHA SECTOR -PISLAMABAD).
- Provision of drilling, blasting and removal of blasted material up to distance of 4 km for Al Huzaifa Construction Company at KAROT HYDRO POWER PROJECT: – As Joint Venture, (spillway, penstock area and Excavation of permanent (No.5 ,3 & 1) 15KM – Roads of project).
- Drilling and blasting services for production of aggregate at KAROT HYDRO POWER PROJECT: -As Joint Venture with Al-Huzaifa Construction.
- Provision of drilling, blasting and removal of blasted material for water channel, shaft at DRAARL Hydro Power Project Bahrain Swat as Joint Venture with Geopak
- Provision of drilling services for FWO, 757CT at Project K4 Water Canal for Supply to Karachi as JV with M/S AAC Construction for Drilling and Blasting
- Rock excavation including drilling, blasting and removal at number of projects in association with AL-NAWASSY ROCK ESTABLISHMENT, ABHA SAUDI ARABIA.
- Oil & Gas Sector excavation and preparation of # 10009001 || Drilling and Blasting at Rayyan-1 Well with POGC at Dadu district Sindh.
- Demolished of 150ft high water tower at Sui cadet college sui district Baluchistan under the Pak Army unit.
- Provision of Drilling for FWO, 104 Engineers Battalion at KKH to Skardu Road Widening Project
(from OCTOBER 2018 -2022).
- Blasting Consultancy & Provision of Drilling Services for FWO, 105 Engineers Battalion KKH To Skardu Road Widening Project (from December 2018-2021).
- Provision of Services for China Gazoba Wah Nobel J/V Working on Extension of Jamshoro Power Plant as Drilling & Blasting and removal of material Contractor (from june-2019-2020).
- Drilling activities at DG khan cement hub Baluchistan from 2021 -2022.